It seems like you’re visiting from a different country. Click the button below to visit the website in your area.
After a site survey and order confirmation, Ice Systems aims to install and commission your commercial ice machine within 5–7 business days. This is a target, not a guaranteed nationwide installation time. Confirm equipment availability, site readiness, and scheduling for your location with the team. Trained engineers install and commission the equipment at your facility.
Ice Systems arranges delivery of commercial ice machines to customer facilities across the USA. Delivery and installation timing is confirmed after a site survey and order confirmation. The published installation and commissioning target is 5–7 business days; faster scheduling may be possible, but should be confirmed for your location and equipment.
Rental machines include installation and support as standard. For a purchased commercial ice machine, request an itemized quote covering the equipment, delivery, installation, and any site-specific work. Do not assume installation is included in a purchase price unless your quote confirms it.
Purchased Ice Systems commercial ice machines include a 12-month parts and labor warranty from installation. Coverage increases to 24 months if Ice Systems completes the first-year service when due. Rental machines include warranty coverage in the monthly rental charge; confirm the applicable terms with the team.
The team visits your facility to assess your production requirements and the proposed installation. Ask the team to confirm equipment access, machine and storage space, electrical supply, water supply, drainage, and ventilation for the selected model. Requirements vary by machine and site, so use the agreed installation specification rather than assuming a standard outlet or a universal clearance.
Storage should be planned alongside production capacity, not treated as the same measurement. Discuss your batch schedule, peak ice requirement, available space, and how ice will move into the mixing process. Ask Ice Systems to confirm the machine, support frame, collection or storage arrangement, and any separately required equipment as part of the site survey and quote.
Plan space for the selected machine, ice collection or storage, and access for operation, cleaning, and maintenance. Ask our team to confirm the equipment dimensions and any required ventilation clearances before you finalize the layout. Share the available floor space and delivery access with the team so the proposed installation can be assessed for your facility.